Decide What the Meeting Has to Settle Before You Draw Anything

Article illustration A pre-application pack should answer a short list of questions, not demonstrate how much design work has been done. Before you open a drawing, write down the three things you need the planning officer to tell you:
  1. Principle of the use. Is the proposed use acceptable on this site at all?
  2. Height and massing. Is the scale you have in mind defensible against the neighbours and the street?
  3. The likely sticking point. Heritage setting, daylight to a neighbour, parking, a protected tree: whichever one you suspect will decide the scheme.
A pack built around questions stays short. A pack built around everything the practice knows about the site does not, and it hands the officer a large file with no obvious place to start. ### Check the authority's own paperwork first Requirements differ between authorities and between service levels, so look up the local form and fee schedule before you commission any drawings. Lambeth publishes a dedicated 2026/27 pre-application guide and fee schedule, while Newham states that its fees are proportionate to the development and the level of service requested. Authorities also separate householder, minor and major schemes, and the documents they expect rise accordingly. West Lothian's 2026 guidance, for instance, treats a "small" local development as up to 10 homes or up to 999 m² of commercial or mixed-use space, with a fee of 20% of the planning application fee, capped at £1,200 including VAT. Fees are generally payable up front. Lancaster says so explicitly. Meetings and site visits can cost extra: West Lothian lists a £120 householder fee that rises by £100 for a one-hour meeting or site visit, and Cheltenham's 2026 schedule runs from £94 for a letter-only householder service to £160 for a site visit and letter. Decide which service you are buying before you decide how much to draw. There is no single national checklist. Before you start, confirm the authority's current form, fee schedule, file-size limits and confidentiality policy.

Authorities ask for different levels of information. Find out what yours wants before you commission application-level drawings for a first conversation.

### Match the pack to the project stage The minimum can be modest. Lancaster says the process usually needs the form, the fee and a scaled plan showing layout and elevation detail, except where specialist heritage advice is involved. A more developed pack, as West Lothian describes it, might add a block plan at 1:500 or 1:250, existing and proposed floor plans and elevations at 1:100 or 1:50, and a draft design and access statement. Our recommendation, and it is workflow advice rather than a national rule, is to keep the pack proportionate to the question. An early massing study and a site analysis sheet are enough to test the principle of a scheme. A near-final design invites detailed comment on materials, window proportions and joinery that you may not want yet. ### Agree what is fixed and what is open Before you write the pack, settle internally what you will not move (the number of homes the client needs, say, or the retained building) and where you want guidance (the eaves height, the setback to the boundary). The pack should make that distinction visible. An officer who can see where you are asking for help gives better answers than one who assumes everything is up for negotiation. ### Let Corb shape the question list In ArchAdemia Tools, Corb can read your brief, the project stage and your project notes and help you turn them into a question list. It names the planning issues worth raising and who decides them. It does not rule on compliance: it will not tell you a scheme complies or that it will be granted, and it never invents a dimension your notes do not give. Treat what it produces as a prompt for the officer, not a verdict. Pre-application advice does not replace a planning application and does not guarantee permission, and the same applies to anything you draft beforehand.

Build the Site and Context Sheet the Officer Will Open First

Article illustration The officer will open the site and context sheet before anything else, so it needs to answer the factual questions at a glance. Assemble these essentials:
  • A scaled site location plan with the red-line boundary
  • Photographs taken from the public realm
  • Neighbouring building heights
  • Known constraints: conservation area, listed neighbours, protected trees
The requirement for scaled plans, and the recommendation for block plans, floor plans and elevations, comes straight from local-authority guidance. The photographs and constraint notes are what make a scaled plan readable. ### Photograph before you model Take the key views on site before you start modelling. You need three: the street approach, the relationship to the nearest neighbour, and the corner the officer is most likely to ask about. These photographs become the evidence behind every later statement of fact. If you start from a site sketch, a phone photograph of it can be added as a trace guide in Linea on mobile. It arrives uncalibrated, so set a real-world length on desktop before you rely on any dimension taken from it. ### Set the sheet in Layout In Layout, the Site analysis template gives you a single sheet to work on, at A3 or A1. Drop in the location plan, the photographs and your annotations, and the layout grid keeps images and text aligned as you place them. The grid is a reference overlay only: it never appears in the PDF export. ### Start the context model in Linea In Linea you can place the scheme on a real location, with the ground and surrounding buildings, so the context model and your drawings come from the same set-up. If your survey arrives as a DWG or DXF, import it into Vector or Linea. The import preview outlines the separate drawings inside the file, so a click on the one you need crops the import to that single plan, cut clean at the edge, landing at true scale on the origin. That matters when a practice CAD file holds twenty-odd drawings in one model space. ### Keep annotations factual Annotate with plain statements of fact: storeys, distances, orientation. Leave opinion for the proposal sheets. "Three storeys, 8.4 m to eaves, 11 m to the nearest habitable window" is a note an officer can use. "Sensitive context" is not.

Facts on the context sheet, argument on the proposal sheets. Mixing the two makes both harder to trust.

Draw the Proposal as Plan, Section and Massing Together

Article illustration The strongest proposal sheets come from one model. When plan, section and massing are cut from the same source, they cannot disagree, and that removes the most common cause of awkward questions at the meeting. ### Block out the scheme in Massing Linea's Massing workspace is built for this stage. Place footprints, extrude them into solids, pitch a roof by dragging an edge, then switch to Build when you are ready for detailed walls, doors and windows. You can block out a scheme quickly without committing to detail you may have to undo after the officer's comments. ### Type exact dimensions Type the numbers as you draw. A wall length, a storey height or an offset can be entered into the box beside the cursor, in the drawing's own units, so 6ft and 1200mm both parse. The figures on the pack then match the model, and when an officer asks for a measurement you can read it straight off the sheet. Neighbouring heights are an obvious case: if the pack states a ridge height, it should be the model's ridge height, not a rounded estimate. ### Cut sections and elevations from the model Linea cuts sections and elevations from the model as real linework and issues them on a sheet. Exporting a sheet as a PDF gives you a true plotted scale on a chosen paper size with a title block. The proposed height against the neighbours then reads at a scale the officer can check, rather than as a diagram. ### Answer area questions on the sheet Add room tags and a room schedule so that area and layout questions are answered in the document rather than in conversation. Rooms carry a number, a name and an area, and the schedule can be placed on a sheet as a table. ### Bring the survey in cleanly If a measured survey is your starting point, import the DWG or DXF into Vector or Linea and crop to the single plan you need using the outlined drawings in the import preview. The file lands at true scale, which means your existing-condition drawings and your proposal drawings share the same origin and the same units.

One model feeding every sheet means plan, section and massing never contradict each other in front of the officer.

Show the Scheme in Context With Views That Tell the Truth

Pre-application views exist to test massing. An officer reads height, roofline and the relationship to neighbours more reliably from an untextured or lightly finished view than from a polished render, where finish distracts from form. Start there. ### Place the cameras properly In Linea, place render cameras at realistic eye height and send a perspective view to the rendering studio. Rendering uses plan credits, and the cost is shown before it runs. Choose the three or four views that carry the argument: the street approach, the nearest neighbour and the contested corner. ### Test conditions without changing the design In Retouch, the Material swap and re-light presets are best used sparingly. A Golden hour and an Overcast version of the key street view show how the scheme sits in different conditions without touching the design itself. These presets regenerate the document at a different time of day or weather as a new layer, so the original stays intact, and each action shows its cost before it runs. ### Variations along one axis Corb's canvas variations can produce a set of two to six readings of one image along a single axis, such as camera or lighting. The clause holding the geometry, massing and openings still is written into every prompt in the set. It is a preservation instruction, not a guarantee, so check every output against the model. If an opening has moved or a roofline has shifted, the view is wrong for a pre-application pack, however good it looks. ### Keep a before-and-after pair For any contested view, make a before-and-after pair. Retouch's layers let the existing photograph and the proposed massing sit in the same frame, so the comparison is exact. This is the image that settles a disagreement about height faster than any paragraph of explanation.

Views in a pre-app pack test the massing. Check every generated view against the model, because a good-looking image that has moved a window answers nothing.

Assemble, Check and Send the Pack as One Readable Document

A pack the officer can read in one pass beats a folder of loose files. Compile it in Layout's Document mode at A3, starting from the Design and Access Statement or Planning statement template. A sensible running order is:
  1. Cover
  2. Questions for the officer
  3. Site context
  4. Proposal
  5. Views
Put the question list on page two. It frames everything that follows, so the officer reads the site and proposal sheets already knowing what you are asking. Add a one-page summary of the scheme in a few sentences, with the key numbers. ### Draft the summary, then check every figure In Layout, Corb can draft the summary text frames from your notes, on a model you choose from Sonnet, Opus or Fable. Writing and building with Corb uses plan credits. Every figure it places should be checked by you against the model before the pack goes out, because a summary that states the wrong storey count undermines the pages around it. ### Export and send Export a vector multi-page PDF at true sheet dimensions. Then check the file size against the authority's upload limit, since limits vary and a pack that is rejected on size wastes a day. A read-only public link is a useful backup: it stays current as you edit, can be revoked, and can be re-issued if you need to change what is shared. Check the authority's confidentiality policy before sending anything commercially sensitive, and confirm the fee has been paid, since advice is generally not given until it has. ### A quick comparison of pack levels
Scheme stagePack contentsWhat it tests
Early conceptForm, fee, scaled plan, context sheet, massing viewPrinciple of use, rough scale
Developed conceptBlock plan, floor plans and elevations, context views, short statementHeight, massing, main constraint
Near applicationFull drawing set, draft design and access statementDetail, policy fit, conditions
The right row depends on the question you are asking and on what the authority's guidance says it will respond to. ### Close the loop after the meeting When the meeting is over, log the officer's comments against each of your three questions. Update the model in Linea and reissue the sheets, so the formal application builds on the same set of files rather than a parallel set. The pack should have cost you a modest amount of drawing time and left you with a model that is already part of the application.

Three questions, one model, one readable document. A pack that stays that disciplined is quick to build and easy to answer.

Start with the questions, check the authority's own form and fee schedule, and draw only as much as those questions need. Everything else can wait for the application.