Planning and setting up a document with Corb
Corb can plan a document with you before he writes anything, then set it up and build it: the sheet size, masters with a title block, styles and colours, and your own reusable template. You talk it through in the Corb section of the panel on the right.
Plan it first
- Open a document and, in the Corb section, choose Plan.
- Say what you want, for example An A3 landscape planning statement template with a title block and page numbers, and choose Send.
- Corb asks only what he can't fairly assume, then says the plan back: the pages, the masters and the styles.
- Change anything by replying. He says the changed plan back.
- Say go, or choose Build this plan. Nothing is written to your document before this.
New plan starts the conversation again. The conversation isn't saved, so leaving the document lets it go too. Planning and building both use credits, and the panel shows what applies before you send.
What you can ask him to set up
- The document: page size, orientation, Sheet or Document, margins, facing pages, bleed, the first page number, the number of pages, and the grid. This works on a document you already have open as well as a new one. Units follow the page size: millimetres, or pixels on a social size.
- Masters: create, rename and delete them, and put real elements on one, such as a title block, a logo placeholder, or page numbers that keep themselves up to date.
- Styles and swatches: create and edit named text styles and colours, so a template carries its own.
Your own templates
Ask Corb to save the document as a template and it joins Your templates on the Layout start page, exactly as Save as template does. Ask him to start from one of them, or from a built-in template, and he'll check what you have.
When he asks before going further
Starting from a template replaces the whole document. If there's content on it, and the document's own named styles, swatches and masters count, a dialog says how many pages go and which document it means, and nothing changes until you press Replace. Deleting a master that's in use, or removing pages that have content, asks the same way. Press Keep it and the document stays as it was, Corb stops there, and any credits held for that build stay with the document for your next ask.
Undo steps back one thing Corb did at a time, not his whole run. It reaches back 60 steps, and on a run longer than that the last Undo still returns to where the document stood before he started.