Revisions

Revisions are a project-wide, numbered issue record. You tick which sheets each revision applies to, and the drawing register lays them out as the classic issue sheet: sheets down the page, issue dates across, revision codes in the cells. In a project, one set of revisions serves every slot.

Select a revision cloud and choose Line style in Parameters to set its outline colour, weight and pattern. The picker is the same as for lines and hatches; the Revision and Comments remain separate.

  1. Choose Project in the menu bar, then its Revisions tab. The line at the top says which revision you are on.
  2. Click Add revision. The date starts as today.
  3. Fill in No., Date, Description, Issued to, Issued by and Purpose, and tick the sheets it applies to.
  4. Tick Issued when it goes out. That locks the row's fields and ticks; untick it to unlock.

In a slot of a project the register belongs to the project: the same revisions appear in every slot, and each slot lists only its own sheets to tick. Editing it in a slot saves to the project straight away and is not part of that slot's undo history. Seq has chevrons to move a row up or down. A register holds up to 60 revisions, and deleting one asks first. A sheet prints the number of the last revision in the list whose ticks include that sheet. A sheet that carries a revision cloud assigned to a revision counts as ticked for it: its box is ticked and locked in the register while the cloud is there.

The drawing register

Click Open register in the Revisions tab, or open the Drawing register group in the Views tab and click a register. It fills the stage with your sheets running down the page in bands by series (the letters at the front of the drawing number), each with its number, name, paper size and scale. Issue dates run across as rotated column heads, and the revision codes sit in the cells, the current code on each sheet in bold. It grows downward, so nothing scrolls sideways: past twelve issue dates the rest wrap into further bands below, each repeating the sheets under a heading such as "Continued: Issues 13 to 24", on the stage, in print, in the PDF and in a register placed on a sheet (a note too small for every band says which issues it left out, so enlarge it). It reads the revisions above; there is nothing to type twice.

Every drawing has one register. Add register makes another, for a stage such as planning against delivery: tick the series or the sheets it covers, and leave everything unticked to cover every sheet. Export PDF saves the register on a page of its own, headed with your practice name or logo and contact details from Project Info, and Print prints the grid. Output has the same thing as Drawing register (PDF). To put a register on a sheet, click the hollow box beside it in the Views tab or drag its row onto the page; it draws the same grid, and deleting the register takes it off the sheets too.

The title block's revision schedule lists applicable revisions oldest first in register sequence, on the sheet and in the PDF. It shows the latest 12 entries when the register is longer. On a sheet, Revision cloud on the left rail opens the shared drafting mini toolbar. Draw with Line, Arc or Rectangle, close the boundary and click the tick. Select a cloud and choose a project revision in the tray dropdown; its revision appears in the schedule. Revision tag stays under Annotate: pick a revision, then place the tag.