Schedules
A schedule is a view: a table of the doors, windows, rooms, stairs or anything else the drawing can count, opened from the Views tab and placeable on a sheet.
To make one
- In the Views tab, click the + on the Schedules heading. Corb opens with a question, "What would you like to schedule today?"
- Tell him: "doors on the ground floor, sorted by mark", or "every room".
- He makes the schedule view and opens it across the whole window. Naming a schedule, level or column the drawing does not have gets you the ones it does have.
The stair schedule lists each stair on the level with its mark (given when the stair is placed, like a door's, and kept when other stairs are added, deleted or reordered; change it in the stair's Mark field, and two stairs typed with the same mark are reported on the schedule), the levels it runs from and to, type, total rise, riser, going, number of risers, width, structure, handrail, infill, tread finish and geometric Check result. A stair with no level at its top reads Unconnected under To. A construction field you have not specified stays blank. Check reads No unusual dimensions or lists the geometric warnings for the stair.
Making a component from a stair keeps it in the typed stair schedule, under the Stair category. Each placement gives a row, mirrored and rotated placements included. Each row reads the stair itself: the level the placement sits on and the level its top reaches, total rise, riser, going, number of risers, width and the Check result, so the row follows the drawing when you change the stair. When the component is made a type, its mark and the details a stair cannot know, structure, handrail and tread finish, come from the type. Where a component holds two stairs, each placement gives a row for each; a type mark such as ST-A becomes ST-A.1 and ST-A.2.
Doors, windows and stairs that sit inside a component you have placed also appear in the main door, window and stair schedules, one row for each time the component is placed, mirrored, rotated, grouped and nested placements included; a hidden placement adds none. The figures come from the element itself. A placed element keeps its own mark with the placement's mark added, such as D01.P3 for door D01 in the placement marked P3, so no two rows share a mark. A door or window is listed once, on the level it is built on (the level its mark is numbered on, normally its host wall's level; for a placed component, the level its opening is built on), even when a lower plan's cut also draws it. Each placement stores its mark (P1, P2 and so on, given when you place or copy it), so deleting one placement never renumbers the others; a placement inside another reads both marks, such as D01.P4.P9. Change a placement's mark in its properties under Placement mark; if two placements hold the same mark the schedule says so.
Corb's opening question is a local message, so it costs nothing; your reply is an ordinary turn. The row count he quotes is counted by Linea, not by him. A building slot offers rooms, doors, windows and the typed-component schedules; a site slot offers the Unit mix of the building types placed on its plots.
The schedule window
A schedule opens full width, and its controls are rows in the right-hand tray. The Schedule row switches which schedule the view shows, and its Level picks one level or all of them (all of them adds a Level column). The Columns row ticks the columns it shows (one always stays). In Sort and filter, Sort by orders the rows and Filter keeps the rows whose chosen column contains your text, applied when you press Enter or click away. Each schedule view keeps its own choices, so two views of the doors can differ. Click the name at the top to rename it. The left rail keeps the tools of the drawing you opened the schedule from, and choosing one takes you back to that drawing.
In a room schedule, the finishes and occupancy are editable cells. The tray's Rooms row holds Find rooms, which turns enclosed spaces into rooms, Number rooms, which fills blank numbers and leaves any already there, and Room number format, which chooses how numbers are written; on any other schedule they are greyed and say why. Below the table, the schedule's own issues are listed (a room with no door, a duplicate mark), and a check that names elements takes you to the plan with them selected.
On a sheet
Drag a schedule from the Schedules group onto a sheet, or click its hollow box in Sheet view. It lands as a table that follows the model. If the box is too short for every row, the last line says how many it left out. A schedule sits on one sheet; delete the schedule view and it leaves the sheet in the same step.